Tubes and trains affected by engineering works
Saturday 30 September and Sunday 1 October
Some lines between London Waterloo and Clapham Junction and part of London Waterloo Station will be closed all day Saturday and Sunday for work on the Waterloo & South West Upgrade project. A reduced train service will run to and from Vauxhall and London Waterloo.
Queenstown Road will have no service.
Passengers are advised
to check displays at stations or utilise live departure boards .
Saturday 30 September and Sunday 1 October
No service between Baker Street and Hammersmith / High Street Kensington.
Saturday 30 September and Sunday 1 October
No service between High Street Kensington and Edgware Road.
Before 0900 and after 2100 each day, no service between Earl's Court and Kensington (Olympia)
Saturday 30 September and Sunday 1 October
No service between Baker Street and Hammersmith.
No planned engineering works
No planned engineering works
The information above is specific to West and South West London. There may be disruption elsewhere on local transport networks.
September 26, 2017
|