Traffic delays likely in the area due to road and lane closures
Spencer Park SW18 is closed at the junction of Battersea Rise for gully repair works commencing on 04/04/2014 to 24/04/2014. Local diversions apply. Engineer T Addlesee 020 8871 8202.
Garratt Lane SW18 outside number 45, (Sainsbury’s) southbound carriageway lane closures for footway reconstruction works commencing 04/02/2014 to 15/04/2014. Engineer D Kelly. 02088715670
09 April — 11 April |
Delays likely Lane closure |
Works location: A214 |
Works description: Wb6-Cat 2h 7 Day Order-Paving Works X 6 Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
09 April — 10 April |
Delays likely Lane closure |
Works location: York Road Wb Os Play Ground Opp Bridges Ct |
Works description: Safety Patch Defect-Rocking/Noisy Mhc Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
10 April — 11 April |
||
Delays likely Lane closure |
||
Works location: On Roundabout At J/W Bridgend Road (Wandsworth Bridge Road) |
||
Works description: Replace Damaged Traffic Signal Equipment On P10 . All Vehicular And Pedestrian Movements Maintained. Nil Excavation. As Notified To Tfl Fpt, Police, Buses And Borough Without Adverse Response .Lane 1 Of 5 2200hrs-0100hrs Rob Cummings |
||
Responsibility for works: Transport For London |
||
Current status: Planned work about to start |
10 April — 10 April |
||
Delays likely Lane closure |
||
Works location: A3 |
||
Works description: Remove Dead Tree/Stump Lane 1 Closure |
||
Responsibility for works: Transport For London |
||
Current status: Work in progress |
11 April — 12 April |
||
Delays likely Lane closure |
||
Works location: York Road Jw Petergate Wb, Jw Petergate Wb |
||
Works description: Wb2-Paving Worksx2 Lane 1 |
||
Responsibility for works: Transport For London |
||
Current status: Planned work about to start |
11 April — 12 April |
Delays likely Lane closure |
Works location: West Hill Jw Haldon Road Wb |
Works description: Paving Works Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |