Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

Chapel Yard SW18 is closed at the junction with Wandsworth High Street for SGN utility works, estimated date of completion 22/09/2019. Contact: SGN 01372 847278

A217 Ram Street, Wandsworth

21 September — 23 September

Delays likely Lane closure

Works description: SEWER MANHOLE AND CHAMBER INSPECTION NON EXCAVATION

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU602TWAI465--001015

A24 Upper Tooting Road, Tooting

21 September — 22 September

Delays likely Traffic control (two-way signals)

Works description: New water connection 1x32mm MDPE MTRD supply off of 3" CI mainexcavat ing 2m footway and 2m in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU309000807951610065-001

A3 East Hill, Wandsworth

21 September — 22 September

Delays likely Lane closure

Works description: Install 60m of 1 way poly duct in Footway

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500285084200

Beechcroft Road, Tooting

21 September — 22 September

Delays likely Road closure

Works description: Permit for traffic management purposes in order to complete the new water connection under permit MU309000807951610065-001

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU309000807951610065-002

Isis Street, Tooting

16 September — 30 September

Delays likely Road closure

Works description: GAS MAIN REPLACEMENT. TO LAY 5M OF 75MM PE LP MAIN, MAKE 2 CONNECTIONS AND ABANDON EXISTING 4"CI MAIN. COMPLETE REINSTATEMENT

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW053W116620185-02543

Gunners Road, Tooting

18 September — 30 October

Delays likely Road closure

Works description: Replace 120m of 6" with 140mm dead insertion. 6 Connections, relay 13 masionettes, 26 services.

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW053W116386796-02171

Augustus Road, Southfields

01 May — 06 October

Delays likely Road closure

Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases.

Responsibility for works: SGN

Current status: Planned work about to start

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started
A214 Woodwell Street
Until January 2020
Some delays likely
Works location: Woodwell Street
Works description: Lane restrictions due to hoarding
Responsibility for workTfL
Current status: Works started

Wandsworth Gyratory, Wandsworth One-Way System

Until January 2020

Delays likely Gyratory changes to two-way flow

Works location: - A3 at Frogmore

Works description: Delays possible

Responsibility for works: TfL

Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.