Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A205 Upper Richmond Road, Putney
26 November — 02 December
Delays likely - Traffic control (multi-way signals)
Works description : Lay new service to 72 West Hill. Excavate N/S C/W maintaining traffic flow using multi way lights. Excavate N/S F/W closing off directing peds to other side
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW047W116730958-05667

A218 Buckhold Road, Wandsworth
25 November — 29 November
Delays likely - Traffic control (two-way signals)
Works description : New water connection 1x2 port B/P MTRD manifold off of 4" CI mainexca vating 5m footway and 1m in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000805133970370-001

A3 Wandsworth High Street, Wandsworth
25 November — 28 November
Delays likely - Lane closure
Works description : Removal of trusses from Sudbury House for the replacement of cladding and fire protection works
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002WANDSWORTHST

A3 West Hill, Wandsworth
25 November — 26 November
Delays likely - Traffic control (multi-way signals)
Works description : Minor non excavation works. 3 way lights and 2 pedestrian crossings on site so MEWP can be positioned on West Hill to carry out maintenance works on the antenna on the telecoms mast. Full chapter 8 signage to be on site.
Responsibility for works: Vodafone
Current status: Planned work about to start
Works reference:  NX21077169/ERI/STM/ARB

A3 West Hill, Wandsworth
26 November — 02 December
Delays likely - Traffic control (multi-way signals)
Works description : Traffic Light heads to maintain traffic flow for the new service to 72 West Hill
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW047W116730958-06045

B229 Bolingbroke Grove, Battersea
27 November — 27 November
Delays likely - Traffic control (multi-way signals)
Works description : Section 81 sewer cover replacement
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU026003345HVWK--001001

B229 Burntwood Lane, Tooting
25 November — 29 November
Delays likely - Traffic control (priority working)
Works description : Leakage repair long side of comm pipe, 4" CI main. Excavation in CW.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000311250740010-001

Bennerley Road, Battersea
25 November — 27 November
Delays likely - Road closure
Works description : For TM purposes only
Responsibility for works: Openreach
Current status: Advanced planning
Works reference:  BC006TI001LC500284505701

Salcott Road, Battersea
25 November — 27 November
Delays likely - Road closure
Works description : For TM purposes only
Responsibility for works: Openreach
Current status: Advanced planning
Works reference:  BC006TI001LC500284505702

Wimbledon Park Road, Southfields
25 November — 28 November
Delays likely - Traffic control (two-way signals)
Works description : Service pipe repair in the footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU27631260128/LEW-CCP

A24 Balham High Road, Balham
26 November — 28 November
Delays likely - Lane closure
Works description : TfL speed camera works - Re-cut 2 lane loops, piezo's and refresh centre Secondary Check Marjks at a speed camera site on behalf of TFL. Site
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG504424984

B229 Bolingbroke Grove, Battersea
27 November — 27 November
Delays likely - Traffic control (multi-way signals)
Works description : Section 81 sewer cover replacement
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU026003345HVWK--001001

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started
A214 Woodwell Street
Until January 2020
Some delays likely
Works location: Woodwell Street
Works description: Lane restrictions due to hoarding
Responsibility for workTfL
Current status: Works started

Wandsworth Gyratory, Wandsworth One-Way System

Until January 2020

Delays likely Gyratory changes to two-way flow

Works location: - A3 at Frogmore

Works description: Delays possible

Responsibility for works: TfL

Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.