Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

A205 Upper Richmond Road, Putney
24 March — 24 March
Delays likely - Traffic control (multi-way signals)
Works description : TM Only Permit / Valve Inspection Only - To allow the team to inspect the Thames Water Valve safely through the chamber lid (No Exc) - Team will be onsite a Max 2hrs (Nights)
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU277NC6965340-01

A217 Garratt Lane, Tooting
26 March — 26 March
Delays likely - Traffic control (priority working)
Works description : Install 8m of 1 way poly duct in Carriageway,Install 9m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference:  BC006TI001LC500293253402

A3 Battersea Rise, Battersea
24 March — 25 March
Delays likely - Traffic control (two-way signals)
Works description : Urgent Remedial works to be carried out - Dig out temp & relay with 10mm SMA patch by lampost 60
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW027W116079823-06414

A3 North Side Wandsworth Common, Wandsworth
23 March — 24 March
Delays likely - Traffic control (two-way signals)
Works description : EXCAVATE IN C/W TO UNCOVER AND OVERHAUL LEAKING CRITICAL TRUNK MAIN VALVE BACK FILL AND REINSTATE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU277HCV6972212-01

Plough Road, Battersea
07 March — 18 April
Delays likely - Lane closure
Works description : Set up site and mark up for open cut. Open cut and lay approx. 45 meters of 180mm PE L/P. Tie onto new 180mmPE main. Backfill & reinstate leaving connection hole open for commissioning. Set up site and mark up for open cut. Open cut and lay approx 80 meters of 180mm PE L/P. Tie onto existing 180mmPE main at Junction of Holgate Avenue and new 180mmPE. Commission new 180mmPE main. Backfill & reinstatement to commence.
Responsibility for works: SGN
Current status: Advanced planning
Works reference:  XW053W116850338-03882

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

March 24, 2020