Forthcoming Major Roadworks in Wandsworth
Traffic delays likely in the area due to road and lane closures

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference: PB002P001703EH000789
|
Beechcroft Road, Tooting
29 June — 01 July
Delays likely - Contra-flow
Works description : pothole
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference: PB002DT/R022130 |
|
Farlton Road, Earlsfield
30 June — 02 July
Delays likely - Road closure
Works description : For TM purposes only
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500293266805 |
|
Garratt Lane, Tooting
30 June — 03 July
Delays likely - Traffic control (two-way signals)
Works description : Disconnection off of 5" CI main excavating in footway & carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU309000808252990120-001 |
|
Swandon Way, Wandsworth
01 July — 02 July
Delays likely - Lane closure
Works description : 10/172 TEL0275604 - TM only for - slot cut c/w sensor loops to repair traffic signals SD3, SD4, SD5, 22.00-05.00, eastbound c/w lanes 1 & 2 swapping to lanes 3 and 4, and f/w to chamber (ped access maintained) Bus Stop: 25511 Suspended
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG516S000000006047 |
|
Wandsworth Bridge Roundabout
01 July — 02 July
Delays likely - Lane closure
Works description : 10/172 TEL0275604 - slot cut c/w sensor loops to repair traffic signals SD3, SD4, SD5 plus feed to existing chamber, 22.00-05.00, West side of roundabout - N/B c/w lanes 1, 2, 3, 4 swapping to lanes 5 and 6 South side of roundabout - W/B c/w lanes 5 and 6 swapping to lanes 1 and 2 and f/w to chamber (ped access maintained)
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG516S000000006046 |
|
Old York Road, Wandsworth
22 June — 30 August
Delays likely - Road closure
Works description : This is part of the council social distasting response we are looking to prove areas for resident to circulate safely.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference: PB002PNOLDYORKRD/TM |
Lydden Road, Wandsworth
08 June — 05 July
Delays likely - Road closure
Works description : Lay 15mtrs 180mm PE. Abandon 15mtrs of 8" CI. Abandon 6mtrs 4" CI. Complete all services. Make 2 mains connections. Complete all reinstatement
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116383969-03113
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
|