Traffic delays likely in the area due to road and lane closures
A214 Trinity Road, Wandsworth |
A217 Garratt Lane, Tooting |
A3 West Hill, Wandsworth |
A3 West Hill, Wandsworth |
Mallinson Road, Battersea |
Bramfield Road, Battersea
15 January — 15 January
Delays likely - Road closure
Works description : S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU026003345HFMC--000005
A217 Garratt Lane, Tooting
16 January — 17 January
Delays likely - Lane closure
Works description : W.R.P Installation of 3 Bay Non Ad Bus Shelter, back to kerb, for and on behalf of Transport For London. Shelter No. 0132/0425 2869095
Responsibility for works: LONDON TRANSPORT
Current status: Planned work about to start
Works reference: RK00100045239
A3 West Hill, Wandsworth
14 January — 16 January
Delays likely - Lane closure
Works description : 10/044 tel0242825 - slot cut c/w sensor loops to repair traffic signals SD3 plus feed to existing chamber (f/w 2m new duct and underkerb) 22.00-05.00, westbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG516S000000005448
Kimber Road, Wandsworth
16 January — 20 January
Delays likely - Traffic control (two-way signals)
Works description : Remedial reinstatement
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMBU/100203774
A3 Huguenot Place, Wandsworth
06 January — 01 March
Delays likely - Lane closure
Works description : WBS SC.2769.254.001 s278 works - Woodwell St footway works from 27/01/20 - 14/02/20 - lane closure & Woodwell St on to Huguenot Pl footpath / corner works from 17/02/20 - 01/03/20 - lane closure. TM plan: 2. Woodwell Street 27.01.19-01.03.20 TMAN
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG429424815
Aboyne Road, Tooting
06 January — 26 January
Delays likely - Road closure
Works description : Phase 3 - Abandon and replace 350m of 12" cast and replacing with 180mm & 250mm PE main on both sides of the road. Relay or tranfer all exiating services and side road connections.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116865650-00006
A214 Woodwell Street, Wandsworth
04 January — 25 January
Delays likely - Lane closure
Works description : WBS CODE SC.2769.254.001 Completion of S278 footpath and kerb works to Woodwell Street foopath outside 39-41 East Hill site Lane & footpath closure, signage, barriers, cone taper, VMS signage
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG429424303
|
Until January 2020 |
||
Delays likely Gyratory changes to two-way flow |
||
Works location: - A3 at Frogmore |
||
Works description: Delays possible |
||
Responsibility for works: TfL |
||
Current status: Works started |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.