Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A214 Woodwell Street, Wandsworth
27 January — 01 March
Delays likely - Lane closure
Works description : WBS SC.2769.254.001 s278 works - Woodwell St footway works from 27/01/20 - 14/02/20 - lane closure & Woodwell St on to Huguenot Pl footpath / corner works from 17/02/20 - 01/03/20 - lane closure. TM plan: 2. Woodwell Street 27.01.19-01.03.20 TMAN
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG429424795

A217 Garratt Lane, Tooting
28 January — 30 January
Delays likely - Traffic control (two-way signals)
Works description : New water connection 1x50mmn MDPE MTRD supply and 1x25mm MDPE MTRDsup ply off of 5" CI main excavating 5m footway & 2m inCarriageway. Our intention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000808252990045-004

A217 Garratt Lane, Tooting
29 January — 31 January
Delays likely - Contra-flow
Works description : Install 8m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference:  BC006TI001LC500288227001

A218 Durnsford Road, Wimbledon Park
29 January — 31 January
Delays likely - Traffic control (multi-way signals)
Works description : Install 10m of 1 way poly duct in Footway,Install 8m of 1 way poly duct in Carriageway,Provide 1 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference:  BC006TI001LC500290594400

Augustus Road, Southfields
24 January — 28 January
Delays likely - Traffic control (multi-way signals)
Works description : S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU026002252HZQJ--000001

A3209, A217 Armoury Way, Wandsworth
29 January — 30 January
Delays likely - Lane closure
Works description : Installation of 3 Bay Non Ad Bus Shelter, Back to Kerb, for and on behalf of Transport for London. Shelter ref 0132/0251 2884415
Responsibility for works: LONDON TRANSPORT
Current status: Planned work about to start
Works reference:  RK00100045440

Aboyne Road, Tooting
27 January — 24 February
Delays likely - Road closure
Works description : Phase 2 - Excavate & insert approx. 210m x 250mm PE down Aboyne Road in phases. Make numerous connections & transfer services. Abandon 210m x 12" CI. Backfill & reinstate.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW053W116531633-00006

Althorp Road, Tooting
28 January — 28 January
Delays likely - Road closure
Works description : CARRIAGEWAY RESURFACING - PLANE 80 MM P& L 50MM HDM & 30MM DBM S/C
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002ALTHORPRD/2019

Loxley Road, Tooting
29 January — 30 January
Delays likely - Road closure
Works description : CARRIAGEWAY RESURFACING - PLANE 30MM P&L 30MM OF 10MM DBM S/C
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002LOXLEYROAD/2019

Mallinson Road, Battersea
29 January — 31 January
Delays likely - Road closure
Works description : Install 7m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference:  BC006TI001LC500285436204

Penwith Road, Southfields
27 January — 29 January
Delays likely - Traffic control (multi-way signals)
Works description : S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU026003345MSMC--000001

Clonmore Street, Southfields
20 January — 03 February
Delays likely - Road closure
Works description : Footway and carriageway work to construct a raise junction
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN0001072018/RM

A3 Huguenot Place, Wandsworth
06 January — 01 March
Delays likely - Lane closure
Works description : WBS SC.2769.254.001 s278 works - Woodwell St footway works from 27/01/20 - 14/02/20 - lane closure & Woodwell St on to Huguenot Pl footpath / corner works from 17/02/20 - 01/03/20 - lane closure. TM plan: 2. Woodwell Street 27.01.19-01.03.20 TMAN
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference:  YG429424815

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started
A214 Woodwell Street
Until January 2020
Some delays likely
Works location: Woodwell Street
Works description: Lane restrictions due to hoarding
Responsibility for workTfL
Current status: Works started

Wandsworth Gyratory, Wandsworth One-Way System

Until January 2020

Delays likely Gyratory changes to two-way flow

Works location: - A3 at Frogmore

Works description: Delays possible

Responsibility for works: TfL

Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

January 28, 2020