A214 Woodwell Street, Wandsworth
27 January — 01 March
Delays likely - Lane closure
Works description : WBS SC.2769.254.001 s278 works - Woodwell St footway works from 27/01/20 - 14/02/20 - lane closure & Woodwell St on to Huguenot Pl footpath / corner works from 17/02/20 - 01/03/20 - lane closure. TM plan: 2. Woodwell Street 27.01.19-01.03.20 TMAN
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG429424795

A214 Woodwell Street, Wandsworth
20 February — 22 February
Delays likely - Road closure
Works description : *****MOBILE CRANE OPP**** LIFTING OF CONSTRUCTION MATERIALS NCT02a- Working hours 07:00-18:00 (working under s278 closure 24/7)- days NCT05a - Works restricted to area agreed in TM plan W20-1774 NCT06a - A minimum width 3.25M shall be maintained for peds/vehicles at all times NCT07a - woodwell street closed under s278 works NCT11b - advance warning signs Site contact: Glen McGowan 07856 003 718
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG105L-MAIN-00009152/UL2

A218 Merton Road, Wandsworth
19 February — 23 February
Delays likely - Traffic control (two-way signals)
Works description : District meter 150mm meter exchange in the carriageway - Intended 1st time perm reinstatement
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU288DM04550

Penwith Road, Southfields
20 February — 21 February
Delays likely - Traffic control (two-way signals)
Works description : WORKING ON BEHALF OF THAMES WATER TO REPLACE FLOW MONITORING EQUIPMENT AND APPROX 3m CABLES TO BE LAID INTO A BOLLARD - C/W & F/W
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU820H032/CWST/AH189

Tranmere Road, Earlsfield
18 February — 21 February
Delays likely - Road closure
Works description : CARRIAGEWAY RESURFACING - PLANE 100MM P& L 60MM HDM BINDER & 40MM HRA S/C REPLACE ASPHALT SPPED HUMPS x 10 NO
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002TRANMERERD/2019

Granville Road, Southfields
15 February — 23 February
Delays likely - Traffic control (two-way signals)
Works description : Carriageway work - proposed raised zebra crossing and remove existing raised table and pedestrain refuge island. Propose 1m footway extension and extend of resurfacing 50m either side of ramp.
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN000107/AH

Aboyne Road, Tooting
27 January — 24 February
Delays likely - Road closure
Works description : Phase 2 - Excavate & insert approx. 210m x 250mm PE down Aboyne Road in phases. Make numerous connections & transfer services. Abandon 210m x 12" CI. Backfill & reinstate.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW053W116531633-00006

Aboyne Road, Tooting
10 February — 09 March
Delays likely - Road closure
Works description : Excavate on all side connection mains within Aboyne Road between Strathdon Drive & Barnfield Close under hase two road closure. Foam off, tranfer onto new 250 PE main which has been inserted inside existing 12" Iron main from Stranthon Drive to junc opp Barnfield Close. Old main thrown dead, new PE Main gassed up, tested. Backfill and reinstate, road closure lifted.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW053W117008418-00006

A3205 York Road, Wandsworth
08 February — 21 March
Delays likely - Traffic control (multi-way signals)
Works description : Set up site and mark up for open cut. Open cut and lay approx. 23 meters of 180mm PE L/P. Tie onto existing 90mmPE main located. Backfill & reinstate leaving connection hole open for commissioning. Set up site and mark up for open cut. Open cut and lay approx. 22 meters of 180mm PE L/P. Tie onto new 180mmPE main. Backfill & reinstate leaving connection hole open for commissioning .
Responsibility for works: SGN
Current status: Advanced planning
Works reference:  XW053W116850254-06622

A3 Huguenot Place, Wandsworth
06 January — 01 March
Delays likely - Lane closure
Works description : WBS SC.2769.254.001 s278 works - Woodwell St footway works from 27/01/20 - 14/02/20 - lane closure & Woodwell St on to Huguenot Pl footpath / corner works from 17/02/20 - 01/03/20 - lane closure. TM plan: 2. Woodwell Street 27.01.19-01.03.20 TMAN
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference:  YG429424815

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

February 18, 2020

<