Traffic delays likely in the area due to road and lane closures
A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference: PB002P001703EH000789
A214 Trinity Road, Wandsworth
08 March — 20 March
Delays likely - Road closure
Works description : Carrigeway Resurfacing, line marking, iron works; Road closure
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG423419442
Wimbledon Park Road, Southfields
21 March — 21 March
Delays likely - Traffic control (multi-way signals)
Works description : Remedial works surrounding sewer cover
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002251SDFL--000001
A217 Garratt Lane, Tooting
19 March — 23 March
Delays likely - Traffic control (priority working)
Works description : Install 8m of 1 way poly duct in Carriageway,Install 9m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500293253401
Plough Road, Battersea
07 March — 18 April
Delays likely - Lane closure
Works description : Set up site and mark up for open cut. Open cut and lay approx. 45 meters of 180mm PE L/P. Tie onto new 180mmPE main. Backfill & reinstate leaving connection hole open for commissioning. Set up site and mark up for open cut. Open cut and lay approx 80 meters of 180mm PE L/P. Tie onto existing 180mmPE main at Junction of Holgate Avenue and new 180mmPE. Commission new 180mmPE main. Backfill & reinstatement to commence.
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116850338-03882
A3205 York Road, Wandsworth
08 February — 21 March
Delays likely - Traffic control (multi-way signals)
Works description : Set up site and mark up for open cut. Open cut and lay approx. 23 meters of 180mm PE L/P. Tie onto existing 90mmPE main located. Backfill & reinstate leaving connection hole open for commissioning. Set up site and mark up for open cut. Open cut and lay approx. 22 meters of 180mm PE L/P. Tie onto new 180mmPE main. Backfill & reinstate leaving connection hole open for commissioning .
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116850254-06622
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
March 19, 2020