Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

Beechcroft Road, Tooting
05 April — 05 April
Delays likely - Traffic control (multi-way signals)
Works description : EXCAVATE IN C/W TO UNCOVER AND OVERHAUL LEAKING CRITICAL TRUNK MAIN VALVE, BACK FILL AND REINSTATE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU277HCV6977003-01

Granville Road, Southfields
06 April — 13 April
Delays likely - Traffic control (two-way signals)
Works description : Proposed footway Build-Outs
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN000472020/AH

Kimber Road, Wandsworth
30 March — 27 April
Delays likely - Road closure
Works description : Lay 10mtrs 250mmPE. Abandon 10mtrs of 6" CI. Complete all services. Make 2 mains connections in conjunction with works on Garratt Lane. Complete all reinstatement.
Responsibility for works: SGN
Current status: Advanced planning
Works reference:  XW053W116398270-02646

Plough Road, Battersea
07 March — 18 April
Delays likely - Lane closure
Works description : Set up site and mark up for open cut. Open cut and lay approx. 45 meters of 180mm PE L/P. Tie onto new 180mmPE main. Backfill & reinstate leaving connection hole open for commissioning. Set up site and mark up for open cut. Open cut and lay approx 80 meters of 180mm PE L/P. Tie onto existing 180mmPE main at Junction of Holgate Avenue and new 180mmPE. Commission new 180mmPE main. Backfill & reinstatement to commence.
Responsibility for works: SGN
Current status: Advanced planning
Works reference:  XW053W116850338-03882

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

April 6, 2020