Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

A3209 Putney Bridge Road, Wandsworth
11 May — 13 May
Delays likely - Traffic control (two-way signals)
Works description : Permanent installation of traffic statistics site. Small road side cabinet with in-road loops and sensors.
Responsibility for works: DFT ROAD STATISTICS DIVISION
Current status: Planned work about to start
Works reference:  QU001J5500

Durnsford Avenue, Wimbledon Park
11 May — 11 May
Delays likely - Road closure
Works description : Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU026003345LJYL--000002

Durnsford Road, Wimbledon Park
12 May — 12 May
Delays likely - Traffic control (Stop/Go boards)
Works description : 10/290 TEL0270307 - RECUT OF MAGNETOMETER SD0, 10:00 - 15:00, LANE 1 - SOUTHBOUND We will Set-Out Advanced Road Works Ahead' sign/s on RAVENSBURY ROAD
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG516S000000005986

Elsenham Street, Southfields
11 May — 06 June
Delays likely - Road closure
Works description : Carriageway work - entry treatment
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN0001182018/RM

Northcote Road, Battersea
11 May — 11 May
Delays likely - Traffic control (Stop/Go boards)
Works description : Interim to permanent
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference:  NK100/SSEMFI/100282950

A3036 St Johns Hill, Battersea
04 May — 18 May
Delays likely - Traffic control (multi-way signals)
Works description : Permit for traffic light head for works under permit MU309000806578470485-001
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000806578470485-002

Plough Road, Battersea
04 May — 18 May
Delays likely - Traffic control (multi-way signals)
Works description : New water connection 2x4 port MDPE MTRD manifold and 2x32mm MDPE MTRD supplies off of 4" CI main excavating 2m footway & 7m carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000806578470485-001

Trinity Road
Until May 2021
Some delays likely - lane closure
Works location: A214 Trinity Road
Works description:Vehicle holding area for Thames Tideway construction
Responsibility for works: TfL
Current status: Works started

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

May 11, 2020