Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

A3 Fairfield Street, Wandsworth
02 June — 03 June
Delays likely - Lane closure
Works description : Sahara survey for leak detection. No excavation, chamber opening only.TM only permit works with MU600MFC003-6
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU600MF003-7

A3 Wandsworth High Street, Wandsworth
02 June — 03 June
Delays likely - Lane closure
Works description : Sahara survey for leak detection. No excavation, chamber opening only.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU600MFC003-6

Strathblaine Road, Battersea
04 June — 05 June
Delays likely - Road closure
Works description : Carriageway resurfacing
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN000332020/AT

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

June 2, 2020

<