Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

Old York Road, Wandsworth
22 June — 30 August
Delays likely - Road closure
Works description : This is part of the council social distasting response we are looking to prove areas for resident to circulate safely.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002PNOLDYORKRD/TM

Heythorp Street, Southfields
13 July — 27 July
Delays likely - Road closure
Works description : Carriageway work - copenhagen style' Entry treatment
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN0001172018/RM

Beaumont Road, Southfields
22 July — 21 August
Delays likely - Road closure
Works description : Related to NationalGrid London Power Tunnels 1 Decommission Project. Decommission of Stop-Joint 13/14, Linkbox 13/14, Pilot Kiosk 3 and Telemetry Kiosk 2 within CW & FW
Responsibility for works: NATIONAL GRID ELECTRICITY TRANSMISSION
Current status: Planned work about to start
Works reference:  HP003OCULPT1723130

Plough Road, Battersea
13 July — 24 July
Delays likely - Road closure
Works description : New water connection 2x4 port MDPE MTRD manifold and 2x32mm MDPE MTRD supplies off of 4" CI main excavating 2m footway & 7m carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU309000806578470485-004

Burntwood Lane, Tooting
23 July — 24 July
Delays likely - Traffic control (priority working)
Works description : Rectifiy reinstatement defect - non-pay in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU302000030966334-002

St Johns Hill, Battersea
20 July — 30 August
Delays likely - Road closure
Works description : Existing waterproofing removal and replacement, span 3 strengthening, carriageway resurfacing and northern kerb line realignment .
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002EH000226/P001481

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

July 21, 2020