Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Forthcoming Major Roadworks in Wandsworth

A217 Wandsworth Bridge, Wandsworth
02 March — 02 December
Delays likely - Lane closure
Works description : Bridge refurbishment. Joint replacement, steel corrosion treatment, re-painting.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002P001703EH000789

Wilna Road, Earlsfield
17 August — 31 August
Severe delays likely - Road closure
Works location: ROAD CLOSURE BETWEEN 77 AND 64 WILNA ROAD
Works description : EXCAVATE AND EXPOSE CONNECTION POINTS OF EXISTING 4"CI L/P MAIN ALONG WILNA RD. OPEN-CUT AND LAY APPROX. 9M X 125MM PE ACROSS WILNA RD TOWARDS FOOTPATH ENTRACE. MAKE CONNECTION ONTO EXISTING 4"CI MAIN ALONG WILNA RD & NEWLY LAID 125MMPE ON FOOTPATH. COMMISSION NEW 125MMPE L/P MAIN. CUT & CAP APPROX. 94M X 125MMPE & 35M X 2"ST L/P MAINS. BACKFILL & REINSTATE. DEMOBILISE
Responsibility for works: SGN
Current status: Planned work about to start
Works reference:  XW053W117025798-06206

Princes Way, Southfields
31 August — 31 August
Severe delays likely - Road closure
Works location: between Albert Drive and Weydown Close
Works description : Road Closure for School Street to operate on Princes Way between Albert Drive and Weydown Close Monday to Friday 8:30 to 9.30am and 2:30 to 3.30pm, term time only.
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB222SCHOOLSTREET_2

Tranmere Road, Earlsfield
31 August — 31 August
Severe delays likely - Road closure
Works location: Magdalen Road to Waynflete Street
Works description : Road closure outside Earlsfield School weekdays 8:30am to 9:15am and 2:45pm to 3:45pm.
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB222SCHOOLSTREET_1

Augustus Road, Southfields
01 September — 04 September
Delays likely - Traffic control (two-way signals)
Works description : Related to NationalGrid London Power Tunnels 1 Decommission Project. Decommission of linkbox 12/13 within CW
Responsibility for works: NATIONAL GRID ELECTRICITY TRANSMISSION
Current status: Planned work about to start
Works reference:  HP003OCULPT1721119

East Hill, Wandsworth
01 September — 02 September
Delays likely - Lane closure
Works description : Thames Water works to excavate to repair/replace broken valve and complete reinstatement - MU277NC6970518-02 raised on St Ann's Hill to enable works
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference:  MU277NC6970518-01

Old York Road, Wandsworth
22 June — 30 August
Delays likely - Road closure
Works description : This is part of the council social distasting response we are looking to prove areas for resident to circulate safely.
Responsibility for works: Wandsworth
Current status: Advanced planning
Works reference:  PB002PNOLDYORKRD/TM

Pirbright Road, Southfields
10 August — 06 September
Severe delays likely - Road closure
Works location: Pirbright Road at the junction with Replingham Road
Works description : Directional closures allowing eastbound movements utilising westbound closures on Pirbright at the junction with replingham and pribright at the junction with Balvernie Grove.
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN000542020_TA

Standen Road, Southfields
10 August — 06 September
Severe delays likely - Road closure
Works location: Standen Road at the Jun with Wimbledon Park Road
Works description : Directional closures allowing eastbound movements utilising westbound closures on Pirbright at the junction with replingham and pribright at the junction with Balvernie Grove.
Responsibility for works: Wandsworth
Current status: Planned work about to start
Works reference:  PB002PN000532020_TA

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.